POS Level 01 effect date is greater than term date

Sort:
You are not authorized to post a reply.
Author
Messages
hussey1213
Basic Member
Posts: 16
Basic Member
    I have an employee that was hired with the incorrect date; 07/12/2018. When attempting to separate them we are getting the message "POS Level 01 effect date 07/12/18 is greater than term date". The employee has only a single position record dated 7/12/2018. Can anyone provide thoughts on how to get this term processed.
    promiseevans
    New Member
    Posts: 3
    New Member

      You have to term them effective 7/12/2018.  That is their start date in the system, therefore, the system does not see them as truly *existing* before 7/12/2018.  I would suggest changing the effective date of the position to the correct start date of 7/12/2016 (I assume) before trying to term or rehire them.

      Margie Gyurisin
      Veteran Member
      Posts: 538
      Veteran Member
        If you can add a record with the same data and the correct effective date, you should be able to delete the "bad" record, remove the end date on the "new" record and then term.
        You are not authorized to post a reply.