PO23

Sort:
You are not authorized to post a reply.
Author
Messages
Deana_W
Basic Member
Posts: 7
Basic Member

    We have an item that any time it is used on a requisition, it will not pull through from the PO100 to PO20.  This item gets hung up in PO23 and has to be forced through to PO20.  We have verified the item is active, set up correctly, has a cost, is attached to a contract and we are still unable to get this item to go through.  Does anyone have a suggestion on what else we could verify and or change to get the item to stop kicking out?

    StephanieD
    Veteran Member
    Posts: 39
    Veteran Member
      When you run PO100, there is an option/parameter where you can Print Exception Report. This will tell you any errors.
      Deana_W
      Basic Member
      Posts: 7
      Basic Member

        Thank you Stephanie.  I will have the user test the item again and view the exception report.  I believe it still stems from the contract but hopefully that report will point me into the correct direction.

        Deana_W
        Basic Member
        Posts: 7
        Basic Member
          The exception report pulled no errors for this requisition but the job will still not pull it through to PO20. Does anyone suggest anything else?
          David Williams
          Veteran Member
          Posts: 1127
          Veteran Member
            Are you running the PO100 by item type or other filter?
            David Williams
            Deana_W
            Basic Member
            Posts: 7
            Basic Member
              The filter is by Req Location Attributes. I actually updated the attributes list about a half hour ago to include the Par location this item was for and the PO100 pulled the req into PO20.
              You are not authorized to post a reply.