Processing EDI 832 file

Sort:
You are not authorized to post a reply.
Author
Messages
Bev Edwards
Veteran Member
Posts: 366
Veteran Member
    I currently have ED502's set up to process inbound GHX files for 810 and 856 transactions sets. Would this job also be the one to use to process the 832's?

    If not, what is?

    If so, what parms do I need to set?

    I can't look at the job to see because I do not have security access to it.

    JonA
    Veteran Member
    Posts: 1162
    Veteran Member

      ED502 picks up the inbound file, translates the data, converts it into a csv file and saves it to the appropriate directory. Then another job is ran to process the csv file.

      Processing Jobs
      810 = MA540 Invoice Interface
      855 = PO122 Transmitted PO Acknowledgement
      856 = MA531 Receipt Interface
      832 = PO560 Bid Response Load

      Unfortunately I don't know much about processing 832's so I don't know the correct way to set up the PO560 job. We have a contracts team that uses Excel and MS-Addins to load or update PO25.6.

      Jon Athey - Sr. Supply Chain Analyst - Materials Management - MyMichigan Health
      Bev Edwards
      Veteran Member
      Posts: 366
      Veteran Member
        Thanks Jon. Is the process your Contracs team uses in place of the PO560 or in conjuction with it?

        I'm just looking at this job for the first time today, so I'm trying to figure out how it works, what the appropriate parameters would be, etc..,,
        JonA
        Veteran Member
        Posts: 1162
        Veteran Member
          In place of. They receive a spreadsheet from the vendor/mfg and verify the data or extract from the GPO and upload to PO25.6 using Addins.
          Jon Athey - Sr. Supply Chain Analyst - Materials Management - MyMichigan Health
          Kat V
          Veteran Member
          Posts: 1020
          Veteran Member
            We would manually run the PO560 to create a bid to run queries against. 

            So you would set up the ED10.  When the file came across:
            1.   
            Go to PO560 and inquire/modify an existing job or create one:

            File Name: Standard format is [VENDOR]832.  Verify with ED10 setup.
            Procurement Group:
            Bid: YYYYDDMM
            Vendor: Vendor# (must reenter every change)
            Override Flag: Y (Yes)
            Description: as desired (usually the vendor name)
            Effective Date: t (today)
            Update Options: 1 (Create Bid Response Line Upd Yes)
            Report Severity
            : F (Fatal Exceptions Only)

            2.    Submit Job.
            3.    
            Go to print manager and save 560 as csv.  This went to the rep to verify subs/backorders vs actually conversions/uom issues.
            4.   
            We had a built query, we'd just change the Bid name to current bid name and run the query. The results would also go to excel to upload back to PO25.6 once reviewed.

            Now we just dl contracts or use contract integrator from GHX.
            You are not authorized to post a reply.