Way to indicate additonal work?

Sort:
You are not authorized to post a reply.
Author
Messages
Den
Advanced Member
Posts: 38
Advanced Member

    Hi Everyone...

    Does Lawson support a feature that tells the user when additional work is needed when an item is received with PO30?  Example, if item XX is received in PO30, can a window pop up and tell the user this particular item needs additional processing?  It does not need to be a pop up window.  Could something have change of color?  Any kind of visual cue, to help us remember this item needs to follow more procedures until completed.

    Additionally, could we do something similar with a group of items, or do they need to be individually setup?  Example, setup a group with 100 SKUs.  When any of the SKUs are received with PO30, can the visual cue orrur?

    Thanks in advance

    Den

    JonA
    Veteran Member
    Posts: 1162
    Veteran Member
      What kind of additional processing are you talking about? Is this something your receiving staff is responsible for? You might be able to use ProcessFlow (v9) or Infor Process Automation (v10) to kick of an email to someone letting them know the item was received and that additional processing needs to occur.
      Jon Athey - Sr. Supply Chain Analyst - Materials Management - MyMichigan Health
      Den
      Advanced Member
      Posts: 38
      Advanced Member
        We have certain items need additonal processing in other programs. So, it would be nice if Lawson would help remind us when these items come in, we need to log the material in our other programs.

        Thanks!
        David Williams
        Veteran Member
        Posts: 1127
        Veteran Member
          This is exactly the type of process that Design Studio is perfect for. You can perform edit checks and either pop-up an alert or add a status bar message to indicate the add'l processing that is required.
          David Williams
          Stephanie
          Veteran Member
          Posts: 86
          Veteran Member
            Another option if you don't have the resources for IPA or Design studio or if this process doesn't apply to every item in your item master: You could also set up the item so that they require inspection before being released in PO30. This is setup in IC12 and can also be updated in PO20. After being received in PO30, someone must "accept" or "reject" in PO34 before the PO30 is released.
            Stephanie Kowal | skowal@rpic.com
            Kat V
            Veteran Member
            Posts: 1020
            Veteran Member
              David - where would the information reside? I'm looking for a way to indicate that an X type item was a sub or one-time purchase, etc on PO20 that we can use to report on.
              David Williams
              Veteran Member
              Posts: 1127
              Veteran Member
                Substitute items are marked as substitutes on the Receiver. It's hard to validate 'X' type items in PO history since the vendor number might not be keyed the same way, missing dashes, etc. but you can perform a query to search for that 'X' type item in purchase history.
                David Williams
                Stephanie
                Veteran Member
                Posts: 86
                Veteran Member
                  Kat - How about using a UF or line comment? Could also use "User Analysis" if you aren't using it for anything else if you didn't want the staff adding too many extra clicks. The substitute vendor item feature would work for item master items too, but can be a lot of extra work for items you may not use again or want to associate with the original mmis #.
                  Stephanie Kowal | skowal@rpic.com
                  Kat V
                  Veteran Member
                  Posts: 1020
                  Veteran Member
                    The UA might work. Also Design Studio to move Purchasing Major/Minor somewhere more visible. Just looking for ideas at this point.
                    Den
                    Advanced Member
                    Posts: 38
                    Advanced Member
                      Great ideas! Thanks everyone!
                      Sheri
                      Veteran Member
                      Posts: 163
                      Veteran Member

                        Hi, so I checked into the 'need inspection' option (checked in IC12) so when the item is received in PO30, it would be 'flagged' as needing further action/inspection. What I saw and (received clarification from Lawson) is.;

                        When a 'inspection required' item is received in PO30, it does not give you any message when releasing, it also does not print a delivery ticket. So you would need to go in PO130 and run that, which would then indicate the item required inspection, Once the record is inspected in PO34, then you can print delivery ticket from PO30.    Does anyone use this?  It seems a bit ridiculous, not intuitive and certainly not user friendly with all these extra steps and no 'flags' for the person receiving????

                         

                        Michelle Wetzel
                        Veteran Member
                        Posts: 183
                        Veteran Member
                          Sheri,

                          That's exactly why we don't use the "needs inspection" function. We have MSCM receiving and it just makes it that much worse with no popups and nothing to indicate the issue until we look at errors. Our work around for when we need inspection is to add it to the deliver to.

                          Everything that comes into our facility with an AC cord needs to be checked for electrical safety so a PO for Purchasing for example would say in the deliver to: SftyCK / Purchasing. This tells Receiving to call the electricians to have them bring up their machine and check the product before it is delivered.

                          Items going to our Biomed department for logging, testing and processing before getting to the floor (everything mechanical that will touch the patient) all have the Biomed phone number in front of the end department (34748/Cardio).

                          It's a little clunky in terms of having to edit the line but it does work.

                          Michelle
                          Stephanie
                          Veteran Member
                          Posts: 86
                          Veteran Member
                            Hi Den, when inspection required is selected it will release the receiver in PO30 putting the inventory quantity "on hold", the creates a PO34 Inspection, until it is accepted it won't become an available quantity to allocate.

                            It should give a message in PO30 to let you know, maybe an enhancement request!? You could customize with design studio as noted in the other comments, but if you have IPA there is a flow that can be used to notify the inspector to take action (po34).
                            Stephanie Kowal | skowal@rpic.com
                            Sheri
                            Veteran Member
                            Posts: 163
                            Veteran Member

                              Thanks Michelle, hard to understand why Lawson would make it so cumbersome. You have a good work around, thanks for sharing.

                               

                              Sheri

                              You are not authorized to post a reply.