PR35.2 Inquiry

 1 Replies
 0 Subscribed to this topic
 12 Subscribed to this forum
Sort:
Author
Messages
JoeS
Basic Member
Posts: 20
Basic Member
We currently use two digit batch numbers and we are getting ready to implement a 3digit batch number.  We have a Design Studio screen of the PR35.2 (quick paint), with some of the fields removed.  Is it possible to change the inquiry process to inquire by process level instead of batch number so that if a employee has time under both a two digit batch and three digit batch both batches would appear on the same screen without having to inquire on the batches separately.  Has anyone done something similar to this?

Thanks.
Joe
Sam Simpson
Veteran Member
Posts: 239
Veteran Member
Sure but that would mean customization to the source codes.